PROXIA Success Story Steeltec

Steeltec User Report

PROXIA Success Story Steeltec

Hot steel planning with a cool head

When it comes to cold drawn steel, Steeltec provides product and performance expertise to SCHMOLZ + BICKENBACH AG. The continuous improvement process (CIP), supported by seamless production monitoring from PROXIA MDE/BDE with diligent MES controlling, reports, and key indicators, has led to a reduction of up to 50% in set-up times, and a 15% increase in production output. In addition, Steeltec is around 70% on the way to achieving the goal of paperless production through the use of Proxia MES.

Highlights and benefits at a glance:

  • Precise MDE/BDE acquisition and production monitoring at two locations
  • Reliable data basis for informative production key indicators
  • Set-up times reduced by up to 50%
  • Increased productivity by up to 15%
  • Long-term support for Group digitisation initiatives


  • PROXIA Case study Steeltec 01
  • PROXIA Case study Steeltec  02
  • PROXIA Case study Steeltec  03
  • PROXIA Case study Steeltec  04
  • PROXIA Case study Steeltec  05
  • PROXIA Case study Steeltec 06
  • PROXIA Case study Steeltec 07
  • PROXIA Case study Steeltec  08
  • PROXIA Case study Steeltec  09
  • PROXIA Case study Steeltec 10
  • PROXIA Case study Steeltec 11
  • PROXIA Case study Steeltec  12
  • PROXIA Case study Steeltec 13


    Read report

     

    Call us!

    +49 8092 23 23 0

     

    European locations

    Locations near you

     

    24h contact

    Contact form

     

    Always there for you!

    Our service hotlines

    Direct contact

    Do you have questions or want to know more about our MES solutions?
    Simply contact us, no obligation at all!

    Contact